February 4, 2021

RESPONSES TO QUESTIONS RECEIVED THROUGH FEBRUARY 03 , 2021 FOR BAYFRONT 1 REDEVELOPMENT: PHASE 1A, SURCHARGE PROGRAM

RESPONSES TO QUESTIONS RECEIVED THOUGH FEBRUARY 03, 2021

 

QUESTION:

 

1. Note 5 of General Construction Notes on drawing 3/47 states that: “Any conditions determined by the Contractor that differ from the information shown on the drawings that are not brought to the attention of the Owner and Engineer prior to the start of work shall not be considered grounds for additional payment or changes to the contract duration, or any other claims against the Owner or Owner’s Engineer.” Please clarify if the start of work in that sentence refers to either the start of a specific activity or item of work or to the start of the contract. If the latter, that would mean that the contractor would need to run topo surveys, soil borings, ground penetrating radar surveys and other studies to make sure the provided bid documents contain accurate information. Please consider removing this note altogether or amending it so that any cost incurred by the Contractor to perform additional inspections and tests prior to the start of work, for the purpose of determining any differing conditions, shall be bore by the Owner.

2. On same sheet, Note 4 of Grading, Drainage and Utility Notes is particularly concerning because it makes the Contractor responsible for the cost to relocate all existing utilities which conflict with the proposed improvements, as if the Contractor had a way to anticipate and estimate any instance in which such conflicts may occur. Please advise if any work required by unforeseen conditions will be performed under item 46, “Allowance for Work Unspecified”.

3. Same note states that “any conditions found to differ from those shown by these drawings shall be brought to the attention of Langan Engineering”. Please confirm that Langan Engineering will be involved with the project and in what capacity.

4. Paragraph 4.03.C.2. of the General Conditions states “Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times if: a) Contractor

knew of the existence of such conditions at the time Contractor made a final commitment to Owner with respect to Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or b) the existence of such condition could reasonable have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for Contractor prior to Contractor’s making such final commitment”. Contractor was not able to carry any site examination prior to the contract award since the pre-bid site visit was held outside of the property and prospective bidders were not allowed on the property for a visual inspection, let alone other exploration, test or study. Please consider deleting this paragraph from the contract or amending it in such a way that the Contractor is not liable for any unforeseen condition or for any discrepancies from the provided bid documents, understanding that the Contractor relied on and based their bid price solely on the supplied bid documents.

 

RESPONSE:

 

1. The start of work in the sentence refers to the start of a specific item of work.

2. The Contractor will not be required to relocate any existing utilities. If same does become required, Bid Item #46 – Allowance for Work Unspecified may be utilized for additional compensation.

3. Langan Engineering will not be involved, any existing site conditions found to differ from those shown on the Contract Drawings shall be brought to the attention of CME Associates.

4. In the event that any unforeseen existing conditions are discovered, that are not disclosed of in the bid documents, after the execution of the Contract, the Contractor shall negotiate a Contract Time Extension with the Owner and/or Engineer. If additional compensation is required for same, Bid Item #46 – Allowance for Work Unspecified may be utilized.

February 2, 2021

RESPONSES TO QUESTIONS RECEIVED THROUGH FEBRUARY 02 , 2021 FOR BAYFRONT 1 REDEVELOPMENT: PHASE 1A, SURCHARGE PROGRAM

RESPONSES TO QUESTION RECEIVED THROUGH FEBRUARY 02, 2021

QUESTION:

1. Is the purpose of the testing the soil to identify an offsite disposal/recycling facility?

2. Do we know the volume of material that requires testing?

3. What is the origin of the material that requires testing? Is it from future utility trenches and/or the current stockpile?

4. Is there any analytical available for the material that requires testing?

5. Will the samples be collected using onsite equipment or does a driller need to be mobilized to facilitate sample collection?

RESPONSE:

1. Soil will not be removed from the site. The purpose of the testing is to verify that the Imported Fill material meets the requirements for “Clean Fill” as described in the Memo from Potomac Hudson LSRP for the JCRA as included in Appendix 8 of the Specifications and Contract Documents.

2. The quantities on the Earthwork Summary on Contract Drawing GT-4 are to be utilized for the basis for the project.

3. The Permanent Roadway Embankment and Site Fills will be composed of Imported Fill material. The source of the material will be selected by the Contractor and approved by the Engineer. Refer to Section 203-Embankment, Subsection 203.02.01 A for Imported Fill material requirements.

4. No. The Permanent Roadway Embankment and Site Fills will be composed of Imported Fill material. Refer to Section 203-Embankment, Subsection 202.02.01.01 B for Environmental Testing requirements for Imported Fill Material.

5. Samples will not be collected on-site. The Permanent Roadway Embankment and Site Fills will be composed of Imported Fill material.

QUESTION:

1. Will CME be willing to release a grading CAD file for takeoff purposes?

2. Per the plan set there is reference to a Proposed Temporary Wooden Safety Fence and a Timber Pedestrian Guard located behind the temporary MSE Retaining Wall. Please provide a typical detail or specification for the requirements of this fence. Please also indicate under which item this is to be paid.

RESPONSE:

1. CME will not be releasing a grading CAD file.

2. The Proposed Temporary Wooden Safety Fence/Timber Pedestrian Guard is included as part of the Temporary Surcharge Retaining Wall design-build. Payment will be included in Bid Item No. 39 Temporary Surcharge Retaining Wall. Refer to Section 515-Temporary Surcharge Retaining Wall, Subsections 515.01, 515.03.01 A and 515.04 of the Project Specifications.

January 29, 2021

RESPONSES TO QUESTIONS RECEIVED THROUGH JANUARY 28, 2021 FOR BAYFRONT 1 REDEVELOPMENT: PHASE 1A, SURCHARGE PROGRAM

RESPONSES TO QUESTIONS RECEIVED
THROUGH JANUARY 28, 2021

QUESTION:

Regarding the attached PDF.

It is unclear if this detail will be required for this phase.

We do not find a specification/pay item that covers these.

If these are required can you define where these will be required, what the required spacing is and how they will be paid for?

RESPONSE:

The “SCHEMATIC EXISTING PIPE BRIDGING FRAME DETAIL (IF AND WHERE REQUIRED TO BRIDGE EXISTING UTILITIES)” located on Sheet GT-42 is not required for this phase.

BAYFRONT REDEVELOPMENT-PHASE 1A, JERSEY CITY – GENERAL CLARIFICATION NO. 4

Bayfront 1 Redevelopment Phase 1A Surcharge Program: Drawings

January 28, 2021

RESPONSES TO QUESTIONS RECEIVED THROUGH JANUARY 27, 2021 FOR BAYFRONT 1 REDEVELOPMENT: PHASE 1A, SURCHARGE PROGRAM

RESPONSES TO QUESTIONS RECEIVED
THROUGH JANUARY 27, 2021

 

QUESTION:

Are RFI’s still due January 29 at 3:00 pm, and if so can they be submitted electronically?

RESPONSE:

RFI’s are to be submitted to the JCRA via email by Friday, January 29, 2021 @ 3:00 P.M. Emails are to be sent to Assistant Executive Director Christopher Fiore (FioreC@jcnj.org) of the JCRA with Sr. Project Manager May Pat Noonan (MaryPat@jcnj.org) carbon copied.

Answers to questions will be posted on the JCRA’s website at “thejcra.org”.

It is the bidder’s responsibility to regularly check the website for any addendums and responses to questions.

QUESTION:

We understand that you are not providing the Cad files for this project; however, the plans provided are scanned, would you be able to provide us with the original document (plans) from the Cad files which should have the original line-work. (Vectorized Drawings)

RESPONSE:

An unsigned PDF copy of the December 2020 Contract Drawings with the original line-work is on the JCRA’s website at “thejcra.org”.

 

BAYFRONT REDEVELOPMENT-PHASE 1A, JERSEY CITY – GENERAL CLARIFICATION NO. 3

Bayfront 1 Redevelopment Phase 1A Surcharge Program: Drawings

January 21, 2021

ADDENDUM NO. 1 FOR THE BAYFRONT 1 REDEVELOPMENT- PHASE 1A, SURCHARGE PROGRAM

CITY OF JERSEY CITY
HUDSON COUNTY, NEW JERSEY

ADDENDUM NO. 1

January 20, 2021

for the

BAYFRONT 1 REDEVELOPMENT – PHASE 1A, SURCHARGE PROGRAM
JERSEY CITY REDEVELOPMENT AGENCY (“JCRA”) CONTRACT NO.:  20-12-MPN8

OUR FILE NO.:  PJC00503.01

TO ALL CONCERNED:

Prospective bidders of the above captioned project are hereby notified of the following:

  • Concerning the Pre-Bid Conferences/Site Tours

  • Be advised that a third Non-Mandatory Pre-Bid Conference/Site Tour is scheduled for Wednesday, January 27, 2021 at 11:00 A.M. to be held at the Bayfront Site Trailers (former JCDPW Site behind the JCMUA Offices located at 555 Route 440, Jersey City, NJ 07305.  Enter through the JCDPW gatehouse located off the Culver Avenue jughandle at Route 440, directly north of the JCMUA Offices.).  It is highly recommended that all prospective bidders attend at least one site/tour meeting to familiarize itself with the existing conditions in order to complete the work required of the Contract.
January 15, 2021

Jersey City Redevelopment Agency Board of Commissioners Meeting For January 2021

VIRTUAL MEETING ADVISORY:

 

In an effort to adhere to social distancing protocols and best practices imposed by Jersey City and State authorities during the COVID-19 pandemic, the Jersey City Redevelopment Agency will hold its regular meeting of the Board of Commissioners on Tuesday, January 19, 2021 at 6:00 p.m., which will be virtually accessible by phone and web via Zoom. The public is invited to attend and participate via the following:

 

Mobile:

 

+1 646 558 8656 US (New York)

Meeting ID: 884 0887 2753

 

Web:

 

https://us02web.zoom.us/j/88408872753

Meeting ID: 884 0887 2753

 

To keep the meeting as organized as possible, members of the public who wish to speak during the public portion(s) of the meeting are encouraged (but not required) to register their name and address with Jesamil Suazo Lozano at jsuazo@jcnj.org or call (201) 761-0819 with their information prior to the meeting date. You may also submit written comment prior to the meeting by emailing jsuazo@jcnj.org. Please indicate “Public Comment” in the subject line of the email. Additional instructions for public comment will be provided during the meeting. Public comment will be guided by the Agency’s designated “Host” on the Zoom platform.

 

The procedures described herein may be modified as circumstances dictate to ensure appropriate access to the Board meeting.

January 15, 2021

RESPONSES TO QUESTIONS RECEIVED THROUGH JANUARY 15, 2021 FOR BAYFRONT 1 REDEVELOPMENT: PHASE 1A, SURCHARGE PROGRAM

RESPONSES TO QUESTIONS RECEIVED
THROUGH JANUARY 15, 2021

QUESTION:

For the proposed roadway ROW’s, are we responsible for bringing the elevations to the
roadway subgrade or is this just going to receive topsoil and seeding for stabilization like
the rest of the disturbed area?

RESPONSE:

The Contractor will not be required to bring the elevations up to the final roadway subgrade. This final grading will be completed under a separate contract. The Contractor is only responsible for filling the site up to the elevations shown on the Embankment Grading Plans of the Contract Drawings. Once the surcharge is completed, the Contractor shall remove the temporary surcharge embankment material and place it in a location outside of the project limits as directed by the Engineer. No fill, topsoil or seeding is required within the project limits after the surcharge material has been removed. The only location where soil stabilization is required will be the final location of the temporary surcharge embankment material.

QUESTION:

I am obtaining bid Documents today for the above mentioned, is there any chance there
will be another site meeting or walk thru? If so I would like to be there for it.

RESPONSE:

Another pre-bid conference/site tour is not scheduled at this time.

 

1/15/21

December 11, 2020

Invitation to Bid: Bayfront Redevelopment – Phase 1A, Surcharge Program

Notice is hereby given that sealed proposals will be received by the Jersey City Redevelopment Agency (JCRA) for CONTRACT NO. 20-12-MPN8 “BAYFRONT 1 REDEVELOPMENT – PHASE 1A, SURCHARGE PROGRAM” and publicly opened and read aloud at 66 York Street, 3rd Floor, Jersey City, New Jersey on TUESDAY, FEBRUARY 23, 2021 at 10:00 A.M., prevailing local time. GIVEN THE COVID-19 CRISIS, IT IS RECOMMENDED THAT BIDS BE SENT BY MAIL OR COURIER BY 4:00 P.M. THE BUSINESS DAY PRIOR TO THE BID RECEPTION. BIDS WHICH ARE HAND DELIVERED BY THE BIDDER OR AN AUTHORIZED REPRESENTATIVE OF THE BIDDER MUST BE RECEIVED NO LATER THAN 10:00 A.M. ON THE DAY OF THE BID RECEPTION. BIDS NOT RECEIVED BY THE DATE AND TIME OF THE BID RECEPTION WILL BE REJECTED. The JCRA and CME Associates will not be held responsible for any bids sent by mail or courier that may become lost, damaged, or not received in time.

The project generally consists of the construction of roadway embankments and placement of surcharge material. The scope of work on the project will consist of the demolition and removal of existing features and utilities, installation of settlement plates and instrumentation, drainage pipes and structures, and all associated work and appurtenances as contained in the Contract Documents as ordered by the Engineer.

Non-Mandatory Pre-Bid Conferences/Site Tours are scheduled for Monday, December 21, 2020 at 11:00 A.M. and Wednesday, January 6, 2021 at 11:00 A.M. to be held at the Bayfront Site Trailers (former JCDPW Site behind the JCMUA Offices located at 555 Route 440, Jersey City, NJ 07305). It is highly recommended that all prospective bidders attend these meetings to familiarize itself with the existing conditions in order to complete the work required of the Contract.

Contract documents and plans for the proposed work may be obtained electronically and will be available to Bidders at no charge. You must register with the JCRA and you will be directed to an FTP site maintained by CME Associates, Consulting Engineering, Parlin office, 3141 Bordentown Avenue, Parlin, New Jersey. You must contact Mary Pat Noonan of the JCRA by phone, 201-761-0828 or via email marypat@jcnj.org. You must register with the JCRA first in order to be eligible to receive a password. The JCRA and CME will insure that the site works, however, JCRA and CME will not be responsible if the Bidder cannot download the document. NO BIDS MAY BE SUBMITTED ELECTRONICALLY. Proposal sheets in Section C of the Contract Documents must be enclosed in sealed envelopes clearly marked on the outside with the words “BID”, CONTRACT NO. 20-12-MPN8, DUE DATE FEBRUARY 23, 2021 – 10:00 A.M., the name and address of the Bidder and the name of the work, addressed to the Executive Director, Jersey City Redevelopment Agency and must be accompanied by a Statement of Consent of Surety from a Surety Company authorized to do business in the State of New Jersey and acceptable to the JCRA.
Questions or requests for information must be submitted in writing as per Section 101.04 and received by: Friday, January 29, 2021 – 3:00 P.M. The JCRA and CME Associates will not be responsible for verbal answers to bidder’s questions. Inquiries received less than twenty-five (25) calendar days prior to the bid opening will not be answered. Responses to the questions will be sent in writing by: Friday, February 5, 2021.

To ensure there is “social distancing” amongst all parties and members of the public in the conduct of the bid opening given the COVID-19 crisis, the bid opening will be conducted via online live streaming of the bid opening, which will be conducted at the JCRA offices, 66 York St., Jersey City, NJ 07302. Interested parties and members of the public are not permitted at this time in the JCRA offices. The names of the vendors and their prices will be announced on the online live streaming, which may be viewed by the general public and interested parties at the advertised bid opening on Tuesday, February 23, 2021 @ 10:00 A.M. All potential bidders, interested parties, and members of the public are to visit the JCRA website, and click on the link pertaining to the Opening of Bids via Online Live Streaming for further instructions respecting observation of the bid opening via live streaming.
Each bid must be accompanied by a certified check or cashier’s check in the amount of not less than ten (10%) percent of the Bid, but not more than $20,000.00, payable without any conditional endorsement as a guarantee that in case the contract is awarded to the bidder, he will within ten (10) days thereafter execute such contract and furnish satisfactory performance bond. Upon failure to do so he shall forfeit the deposit as liquidated damages and the acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. No interest shall be allowed upon any such certified check or cashier’s check. A bid bond in the amount of ten (10%) percent of the bid, but not more than $20,000.00, may be substituted for certified check or cashier’s check.
Each bid must also be accompanied by a certificate from a bonding company licensed to do business in the State of New Jersey guaranteeing that if the proposal of the bidder be accepted they will furnish the bond set forth in paragraph one of the General Conditions of the contract and the acceptance of the bid will be contingent upon the fulfillment of this requirement.
The JCRA reserves the right to increase or decrease quantities specified in the manner designated in the Specifications. The JCRA reserves the right to award this contract based on funds available.

All bidders are required to be registered with the New Jersey Department of Labor if they elect to bid public works projects. The bidder shall be required to comply with “The Public Works Contractor Registration Act” (N.J.S.A. 34:11- 56.48), as identified in Section B – Instruction to Bidders paragraph B3.13 and in the Appendix of the Specifications and Contract Documents. All Contractors and Subcontractors working on prevailing wage projects, which have a public building component, must attach a certificate of registration from the Department of Labor, to all bids.

All bidders are required to submit “Proof of Business Registration” to the contracting agency if they elect to bid public works projects. Proof of business registration shall be a copy of a Business Registration Certificate issued by the Department of the Treasury, Division of Revenue. The bidder shall be required to comply with business registration provisions of N.J.S.A. 52:33-44 (P.L. 2004, C.57), as identified in Section B-Instruction to Bidders paragraph B3.14 and in the Appendix of the specifications and Contract Documents. All Contractors and Subcontractors working on public work projects must attach a Business Registration Certificate to all bids.

The successful bidder shall be required to comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the laws of 1963, effective January 1, 1964. During the performance of this contract the Contractor agrees to comply with the requirements of N.J.S.A. 10:5-31 et seq., and N.J.A.C. 17:27, all requirements of the State of New Jersey Worker Health and Safety Act (N.J.A.C. 12:110 et seq.) as amended and the United States Occupational Safety and Health Act (OSHA) (29 CFR 1910), as amended with regard to worker and jobsite safety.

No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening thereof. The successful bidder will be required to furnish a surety company bond in the full amount of contract price indemnifying the Jersey City Redevelopment Agency, for all proceedings, suits or actions of any kind of description and conditional for the faithful performance of the work.
All bid security will be returned to all Bidders except the three (3) apparent lowest bidders within ten (10) working days after the opening of bids, and to the three (3) apparent lowest Bidders within three (3) working days after the successful Bidder has executed the Contract and his Contract security has been approved by the City.

The Project is subject to a Project Labor Agreement. The Successful Bidder will be required to execute a Project Labor Agreement. The JCRA reserves the right to reject any or all bids if in its opinion it is in the best interest to do so and to award the contract for any and/or all items.

BY ORDER OF THE BOARD OF DIRECTORS AND OFFICERS OF THE JERSEY CITY REDEVELOPMENT AGENCY.
DIANA H. JEFFREY
EXECUTIVE DIRECTOR

DOWNLOAD BID DOCUMENTS:
Specifications and Contract Documents, December 2020_20-12-MPN8 (319MB)
Contract Drawings, December 2020_20-12-MPN8 (43MB)

December 11, 2020

Jersey City Redevelopment Agency Board of Commissioners Meeting For December 2020

VIRTUAL MEETING ADVISORY:

 

In an effort to adhere to social distancing protocols and best practices imposed by Jersey City and State authorities during the COVID-19 pandemic, the Jersey City Redevelopment Agency will hold its regular meeting of the Board of Commissioners on Tuesday, December 15, 2020 at 5:00 p.m., which will be virtually accessible by phone and web via Zoom. The public is invited to attend and participate via the following:

 

Telephone:

 

Call-in number: (646) 558-8656

Meeting ID:         896 5462 4110

 

Web:

 

Zoom Link:          https://us02web.zoom.us/j/89654624110

Meeting ID:        896 5462 4110

 

To keep the meeting as organized as possible, members of the public who wish to speak during the public portion(s) of the meeting are encouraged (but not required) to register their name and address with Jesamil Suazo Lozano at jsuazo@jcnj.org or call (201) 761-0819 with their information prior to the meeting date. You may also submit written comment prior to the meeting by emailing jsuazo@jcnj.org. Please indicate “Public Comment” in the subject line of the email. Additional instructions for public comment will be provided during the meeting. Public comment will be guided by the Agency’s designated “Host” on the Zoom platform.

 

The procedures described herein may be modified as circumstances dictate to ensure appropriate access to the Board meeting.

November 6, 2020

Jersey City Redevelopment Agency Board of Commissioners Meeting For November 2020

VIRTUAL MEETING ADVISORY:

In an effort to adhere to social distancing protocols and best practices imposed by Jersey City and State authorities during the COVID-19 pandemic, the Jersey City Redevelopment Agency will hold its regular meeting of the Board of Commissioners on Tuesday, November 10, 2020 at 6:00 p.m., which will be virtually accessible by phone and web via Zoom. The public is invited to attend and participate via the following:

Telephone:

Call-in number: (646) 558-8656
Meeting ID: 862 4449 2272

Web:

Zoom Link: https://us02web.zoom.us/j/86244492272
Meeting ID: 862 4449 2272

To keep the meeting as organized as possible, members of the public who wish to speak during the public portion(s) of the meeting are encouraged (but not required) to register their name and address with Jesamil Suazo Lozano at jsuazo@jcnj.org or call (201) 761-0819 with their information prior to the meeting date. You may also submit written comment prior to the meeting by emailing jsuazo@jcnj.org. Please indicate “Public Comment” in the subject line of the email. Additional instructions for public comment will be provided during the meeting. Public comment will be guided by the Agency’s designated “Host” on the Zoom platform.

The procedures described herein may be modified as circumstances dictate to ensure appropriate access to the Board meeting.